| Table 6.23 Environmental Statements 30 September 19971 |
| | | Development Project | Totals | Number |
| Total number of statements | 271 | 271 |
| Schedule 12 |
| | | Radioactive Waste Disposal | | 3 |
| | | Intregrated Chemical Installation | | 3 |
| | | Road/Rail/Airport | | | 3 |
| | | A trading port/Inland waterway | | 2 |
| | | Special Waste Treatment | | 5 |
| | | Special Waste Landfill | (24) | 8 |
| | | Total Schedule 1 projects | | 24 |
| Schedule 23 |
| Agriculture |
| | | Pig-rearing | | | 1 |
| | | Poultry-rearing | | | 4 |
| | | Installation for Rearing of Salmon | | 1 |
| | | Land reclamation | | (7) | 1 |
| Extractive Industry |
| | | Unclassified | | | 1 |
| | | Extracting peat | | | 3 |
| | | Extracting minerals (non metal- |
| | | liferous or energy producing) | | 41 |
| | | Extracting coal or lignite | | 29 |
| | | Extracting natural gas | | 2 |
| | | Extracting ores | | | 1 |
| | | Open-cast minerals (non metal- |
| | | liferous or energy producing) | (81) | 4 |
| Energy Industry |
| | | Unclassified | | | 2 |
| | | Production of electricity | | 3 |
| | | Installation for carrying gas |
| | | steam or hot water | | 1 |
| | | Surface storage of fossil fuels | | 1 |
| | | Industrial briquetting of |
| | | coal and lignite | | | 1 |
| | | Installation for the collection or |
| | processing of radioactive waste | | 1 |
| | | Wind Farms | | (32) | 23 |
| Processing of metals |
| | | Ship yards | | (1) | 1 |
| Food Industry |
| | | Slaughter of animals | | (1) | 1 |
| Textile, Leather, wood and Paper Industries |
| | | Manufacture of fibre board, particle |
| | | board or plywood | | 2 |
| | | Manufacture of pulp paper |
| | | and board | | (6) | 4 |
| Rubber Industry |
| | | Elastomer manufacture/treatment | (1) | 1 |
| Infrastructure Projects |
| | | Industrial estate | | | 13 |
| | | Urban development project | | 16 |
| | | Ski lift or cable car | | | 5 |
| | | Road harbour aerodrome | | 5 |
| | | Dam or other installation | | 1 |
| | | A tramway or railway |
| | | for passenger transport | | 4 |
| | | Oil or gas pipeline | | | 2 |
| | | Yacht marina | | | 4 |
| | | Motorway service area | | 2 |
| | | Coastal protection works | (53) | 1 |
| Other projects |
| | | Holiday village/hotel complex | | 14 |
| | | Racing or test track | | | 1 |
| | | Disposal of controlled waste | | 35 |
| | | Waste water treatment plant | | 11 |
| | | Depositing sludge | | | 2 |
| | | Modification of a development |
| | | within Schedule 1 | | (65) | 2 |
| No. of Schedule 2 Projects | | 247 |
| Source: Planning Services Division, SODD |
| 1 Sent to the Secretary of State under planning legislation. |
| 2 Environmental assessment is mandatory. |
| 3 Environmental assessment is required if the project is likely to have significant environmental effects. |
| ( ) Sub totals |