Catering

7.1 Staffing in the kitchen comprised a Catering Manager, two Supervisors and five Officers who worked a shift pattern that ensured that the area was covered from 0530 to 1730 hours on weekdays and from 0600 to 1700 hours at weekends. Support was provided by a party of 22 prisoners with Catering staff being involved in the selection process. All prisoners working in the kitchen were given a two week trial period after medical clearance and before their appointment was confirmed. In addition to their initial training in food handling and hygiene, training to SVQ Level 2 was available with qualified catering staff delivering the training and conducting assessments. Prisoners in the party were paid a basic wage of £11 for a five day week with the offer of an additional £1.50 per day for working Saturday and Sunday.

7.2 At the time of our inspection, catering was being conducted from a temporary kitchen pending the completion of a completely refurbished facility which was due to open very shortly after our inspection and appeared to be a first class facility.

7.3 An advance menu system was in operation and was based on a four week menu cycle. Lunch comprised a choice of main courses and a sweet, with the evening meal consisting of soup and a choice of main course. All medical and religious diets were catered for and supplies of halal meat were kept. During the course of our inspection, we sampled various meals at a number of locations and were satisfied with the quality of what was on offer.

7.4 Meals were transported to the Halls in heated trolleys and prisoners then ate their meals in their cells, though consideration was being given to introducing dining in association for a limited number of prisoners in ‘C’ and ‘D’ Halls. The kitchen was also responsible for providing the meals for the NIC and for HM Unit Shotts with an appropriate system in place for those two establishments to be charged at the standard rate for prisoners’ meals. At the time of our inspection, the Catering function was operating successfully within budget.

7.5 Recently, a survey had been carried out to get prisoners’ views on the meals on offer and to invite suggestions for change. Based on the results of that survey, a new menu was in the process of being prepared and was scheduled to be introduced to coincide with the opening of the new kitchen. The menu was checked from a health point of view on an annual basis by the establishment’s MO whilst every six months, a dietician from the local Health Board was invited to comment on its nutritional value. Temperature readings of all hot foods were taken both in the kitchen and at the point of serving and samples of meals were tested in the Halls by Residential Managers and by members of the Visiting Committee (VC). Members of the Catering staff made regular visits to the Halls when meals were being served and a food complaints and a food compliments system were in place to offer prisoners the opportunity to give their opinions.

7.6 In an effort to maintain standards and to answer any criticism, a system of focus Groups was about to be introduced. These groups would comprise prisoners and staff, including Catering staff, with one group covering ‘A’, ‘B’ and ‘C’ Halls and a separate group operating for ‘D’ Hall. The aim was that the groups would meet on a regular basis to consider improvements to what was currently on offer and to respond to any questions.

7.7 A good relationship had been established with the local Environmental Health Office whose representatives made regular visits to the establishment with no major concerns being raised. Similarly, the Catering function was inspected on a regular basis by the SPS’s Catering Adviser.

Comment

7.8 We were impressed with the Catering function and in particular, the way in which it had continued to operate whilst major refurbishment work was in progress. The range and quality of the meals were satisfactory though it should be noted that some of the meals were being served at times that did not comply with the SPS’s Operating Standards. We were told that Catering staff would be able to provide meals at the prescribed times but this would require a new attendance pattern for Residential staff and currently there was a formal dispute over this issue. We suggest, however, that steps be taken to ensure that meal times are adjusted to comply with the relevant Standard.

Canteen

7.9 Each Hall had its own canteen which was located in a secure room adapted for that purpose. Designated Officers from each Division were responsible for operating the canteens for which the main opening time was on a Thursday evening, after prisoners’ wages were paid, with ‘top-up’ sessions being available on Friday and Monday evenings. All transactions were in cash and we were satisfied with the financial control system that was in place. Similarly, we were satisfied that stock turnover and replacement were being adequately managed.

Comment

7.10 We were disappointed with the unimaginative range of stock on offer and the general absence of price lists. This was an issue that had been raised in the report of our last inspection and we suggest, therefore, that a price list should be placed on prominent display at each canteen together with a list of the items available for sundry purchase. A number of copies should also be available on the landings.

7.11 We were also informed that, in line with the practice now being employed in a number of other establishments, consideration was being given to the introduction of a ‘bag and tag’ system for canteen purchases.

Laundry

7.12 The laundry was a modern and well equipped facility which, in addition to meeting internal requirements, continued to undertake laundry work for other establishments, including HMPs Low Moss and Barlinnie, HM Remand Institution Longriggend, HMYOI Polmont and the SPS College. Additionally, it had a small seasonal contract with an external customer.

7.13 A business-like approach to its daily operation had been underpinned by the recent introduction of a Quality Assurance Policy and by the development of Service Level Agreements with its main SPS customers, a task which was ongoing at the time of our inspection. The rationalisation of its internal processes would be further strengthened by the proposed introduction of a garment finishing area. First line management was provided by a Laundry/Gardens Supervisor and the facility was staffed by three Officer Instructors though we noted that only one of the Instructors had received accredited training. The prisoner complement was 50 and had doubled since our last formal inspection, essentially due to the closure of former VT Workshops and the streamlining of the recently introduced enhanced work parties.

7.14 Nevertheless, despite the work generated by other SPS customers, the laundry was only working at 50% of its operational capacity (29 prisoners were working on the day of our inspection but there appeared to be insufficient work even for this reduced number). Additionally, all Residential Halls had been equipped with industrial washing machines and dryers which were operated by the Hall laundry passmen and were used to wash personal items of kit, although the main laundry had also introduced a net bag system for this purpose. Each Hall was responsible for replacing worn out items and ensuring that larger items such as bedding were forwarded to the main laundry for washing.

Comment

7.15 We were pleased to note the comprehensive nature of the laundry facilities and the full compliance with the SPS’s Laundry Operating Standards. Similarly, the developments to place the laundry on a more business-like footing are also welcomed. However, there was insufficient work for the number of prisoners allocated to the laundry and we therefore suggest a marketing effort to secure further external customers. We suggest also that improvements be made to the prisoners’ rest room facility. Finally, we have written to the Governor suggesting that accredited training be provided for all the Officer Instructors.

Estates

7.16 The Estates Team consisted of an Estates Manager, two Clerks of Works, two Tradesmen and one Administrator. In addition, there was a Contracts Team which comprised a Manager supported by three Supervisors, 20 Tradesmen and two Administration/Stores staff. We were advised that relationships between the two teams were very good.

7.17 We were satisfied that small repairs were being carried out efficiently and having inspected a number of minor works projects, we were impressed by the high standard of workmanship. At the time of our inspection, three capital projects were ongoing - viz, a £1.6m refurbishment and extension of the kitchen, an upgrading of perimeter security at a cost of £640,000 and the creation on the site of a former blaes surface football field of a grassed pitch with a running track together with a smaller all-weather sports pitch at a total cost of £124,000. We noted also that all WTIs were up to date though we were advised that the painting schedule was not always up to programme, with the Reception area in particular being in need of some attention.

Comment

7.18 In overall terms we were satisfied with the general maintenance of the buildings, which was due to the enthusiasm of the staff working in the establishment and support from the Estates Directorate at SPS HQ. We were advised that the present Estates contract for maintenance was due for renewal in December 1998 but had been extended to March 1999 in order to bring it into line with the financial year. A new service level agreement had been agreed.

Energy

7.19 The main sources of energy were electricity and gas and we were advised that the establishment was on target for energy spending for the current financial year. Nevertheless, we suggest that a local Energy Committee should be formed.

7.20 When the establishment had first been designed, the plan had been for it to run an extensive laundry service and for that reason, two large boilers had been installed. However, those plans had been subsequently scaled down with the result that the boilers were inefficient due to over-capacity. We therefore support Management in their Strategic Bid for the installation of a smaller boiler which, we were advised, would pay for itself within a few years.

Fire Precautions

7.21 The establishment’s Fire Precautions Officer (FPO) was an Estates Supervisor who was supported in that function by a Deputy FPO who was an Estates Officer; both had attended the relevant training course at the Scottish Fire Services College. Both were also members of a recently constituted local Fire Committee, the other members of which were from all other functional areas of the establishment. It was the aim of the Committee that it would meet on a quarterly basis. The FPO was also a member of the local Health and Safety (H & S) Committee.

7.22 Excellent relationships had been established with the local Fire Brigade who made regular visits to the prison and who had made a video of the establishment for their own training purposes. The prison suffered from a relatively high incidence of wilful fire raising and in accordance with agreed procedures, the Brigade was called out on every occasion. After every such incident, a full investigation was undertaken including, where appropriate, photographs of the damaged areas and if the event was considered to have been serious enough, there was a full debrief exercise to try to identify any faults in local procedures.

7.23 The FPO had a session on the induction process for all staff new to the establishment and for that purpose, had prepared a comprehensive set of guidance notes on fire related issues which was given to every new member of staff. There was, however, a problem about getting other staff away from their core duties to deliver a similar training package though we were assured that efforts were being made to resolve that difficulty.

7.24 Short duration breathing apparatus (SDBA) was in place and all staff had received basic training in the use of that equipment. An area previously used by the establishment’s Gardens Party had been allocated for the purpose of providing SDBA (and Control and Restraint) training though we noted that the area in question had had to be furnished using various odds and ends acquired from other parts of the prison. However, that area had now been designated as the site of the proposed new staff facilities - see paragraph 9.16 - and no indication had been given as to where the training area would next be allocated, leading to some uncertainty on the part of the staff involved. We were advised that due to difficulties in getting staff released for training, there was now a considerable backlog in providing refresher training in the use of the SDBA equipment for Residential staff which meant that many of them were no longer competent to use the equipment.

7.25 All fire appliances were being regularly checked and maintained and there was a detailed computerised record-keeping system in place. Fire Orders had recently been updated and widely circulated and a copy of the hydrant plan was held by the Fire Brigade. All cell doors had been fitted with inundation bungs, the levers to open these being held in the hose reel boxes, for which every member of staff had a key.

7.26 There was a fire alarm system in the establishment but no smoke detection system, though the installation of such a system had been recommended in the report of a recent inspection by HM Inspectorate of Fire Services. That report had also contained a number of other recommendations and a comprehensive programme to address these had been put in place.

7.27 At the time of our inspection, a system of fire risk assessments was about to be introduced. All the relevant paperwork had been prepared but it was proposed to undertake a form of pilot study - perhaps in the new kitchen - to develop the system more fully before introducing it throughout the establishment.

Comment

7.28 We were impressed by the way the FPO and the SDBA instructor were trying to raise the profile of fire precautions within the establishment. We were pleased also to note that senior Management was supporting them in their efforts. However, a number of issues needs to be addressed, including the following:-

7.28.1 Steps should be taken to ensure that all staff receive appropriate training in fire related matters, including addressing the backlog in refresher training for SDBA equipment;

7.28.2 Fire exit signs should be installed at all appropriate locations; and

7.28.3 A system of holding regular fire drills should be introduced.

Health and Safety

7.29 Two H & S Committees had been established within the establishment - an Executive Committee, which comprised the Governor and Senior Managers and which held responsibility for the establishment’s overall H & S policy as well as providing high-level impetus; and a subsidiary Liaison Committee, which was responsible for implementing the policy at operational level. A local H & S policy had been published some time ago and was being routinely revised at the time of our inspection.

7.30 Risk assessments had been completed in 75% of work areas and safe systems of work had been developed. All new staff were given awareness training and plans were in hand to deliver further training at appropriate levels, including NEBOSH, ‘Managing Safely’ and ‘Working Safely’ training. The SPS H & S Advisor had recently visited the establishment to conduct an audit and work was in progress to address points raised in his report, which had been delivered in October 1998.

Comment

7.31 We were satisfied that H & S issues were being given a high profile, that the issue was being managed effectively at an appropriate level and that the necessary work was being actioned. We were particularly interested to note that as a part of their uniform, all staff had been issued with belt-pouch first-aid kits, containing mouthpiece, surgical gloves, protective apron and a bag for the disposal of body-fluid contaminated items. In addition to providing staff with the tools necessary to respond to first aid emergencies in a practical and tangible way, this measure also had the effect of raising the H & S profile in the establishment. This is a practice which we strongly commend to other establishments.

 