On this page:

Inverclyde Academy

General Introduction to Project

InverclydeInverclyde Council's aim was to provide a modern, sustainable, flexible and well equipped school with excellent internal environmental conditions. The new school consolidates the former Wellington Academy and Greenock High School onto one campus on the site of existing Ravenscraig blaes football pitches adjacent to the Inverkip Road and an athletics stadium.

This was the first new secondary school to be built by Inverclyde Council for a number of years and officials were committed to producing a landmark campus that would also act as an exemplar to inform the design of subsequent schools. The Council were determined that the campus would be a positive statement to all Inverclyde residents about the value placed on Education.

The school is included as a case study due to its many sustainable and distinctive features and the extensive consultation process carried out by the authority and design team which undoubtedly added value to the final design.

Key Project Data

Name of School:

Inverclyde Academy

Sector:

Secondary

Address:

1 Cumberland Road, Greenock, PA16 OFB

Client/Local Authority:

Inverclyde Council

School Capacity:

1100

Procurement Route:

Traditional (Design and Build)

Project Value:

£29 million

Gross Internal Floor Area:

13624 sqm

Design Team:

Studio E Architects, London; M & E Consultants; Max Forham LLP, Edinburgh; Structural Engineers, Curtins Consulting Ltd Edinburgh; Landscape Architect Livingstone Eyre, London; CDM Co-ordinator CDM Project Safety Ltd

Specialist Consultants

BREEAM Assessor, Ramboll Whitbybird, Glasgow; Testing & Commissioning Engineer, Hulley SFM, Glasgow

Contractors:

Barr Construction Ltd

Start Date:

5 February 2007

Completion Date:

15 December 2008