Sand and Shingle Removal
10.1 The obligation is to consult and receive
permission before any extraction takes place in order to
prevent damage to sensitive areas. Requests should detail
site location and amount of material to be removed, a
single request may be made to cover a period of several
years.
10.2 Following receipt of such a request the views
of local SNH staff should be sought. Should a site
inspection be involved this should be a joint SEERAD/SNH
visit.
10.3 As a result of the applicant's request he
should be advised either that:
- the work proposed can proceed;
- amended proposals can proceed;
- work cannot proceed without causing environmental
damage which could result in the RSS agreement having
to be cancelled and possibly payments made having to be
recovered.
10.4 The consultation procedures between SNH and
SEERAD may be amended by mutual agreement between the PAO
or RSS co-ordinator and local SNH staff.