ANNEX 4 SUMMARY OF EXISTING 2020 AIMS

Source

Capacity ( GW)

Location

Notes

Future Marine Energy. The Carbon Trust. (2006)

3 GW

UK

Installed

Path to Power. BWEA (2006)

3 GW

UK

Installed

Harnessing Scotland's Marine Energy Potential.FREDS Marine Energy Group (2004)

1.3

Scotland

Installed

Strategic Objective. Scottish Renewables Forum (2008)

1.3

Scotland

Consented by 2017

Marine Energy Road Mapping for Scotland. Aquaret (2008)

1

Pentland Firth

Operational in 2020

UKERC Marine Renewable Energy Technology Roadmap.UKERC (2008)

2

UK

Installed capacity. Estimated breakdown for Scotland - 1 GW.

Saltire Prize. Scottish Government

<0.030

Scotland

Installed by 2017

The Crown Estate - Pentland Firth Strategic Area

0.7

Pentland Firth

Installed