OPTION 17(ii): MANAGEMENT OF MOWN GRASSLAND FOR CORNCRAKES

£

£

Income foregone:

5

tonnes hay

140

per tonne

700

40%

280.00

Additional Costs:

Bird-friendly mowing

9.40

5 wks alternative grazings*

92.10

Total:

381.50

per hectare

Assuming this option will generally be adopted within the Corncrake Core Areas.
Average hay yield (extensive crop): 5 tonnes/hectare
Average hay price (Outer Hebrides 2006): £140 per tonne
For bird-friendly mowing, assumed that contracor's work rate will drop from 1 hectare per hour to 0.67 hectare per hour. Therefore, 1.5 hours taken to mow 1 hectare @ £19.80 per hectare. Additional cost is £9.40 per hectare.

*

£

£

per ha

Total Additional Costs:

Rented grazings

1

hectare @

200

x

0.19

(5 wks of 6 months)

38.00

Supervision

1

hectare rented grazings for

5

weeks @

£7.82

per hr per wk per ha rented

39.10

Wormer & haulage

7.5

ewes @

2.00

15.00

Total:

92.10