On this page:

Scottish Transport Statistics: No 26 - 2007 Edition

« Previous | Contents | Next »

Listen

Table 8.9 Rail punctuality: Public Performance Measure - for all services

1996-97

1997-98

1998-99

1999-00

2000-01

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

percentage of trains arriving "on time"

GNER1

..

84.3

84.6

86.8

71.1

70.0

70.8

74.1

77.5

83.5

82.7

ScotRail 2

..

93.9

93.0

92.1

86.8

82.2

82.1

85.5

83.1

85.8

88.8

Virgin CrossCountry 1

..

82.6

73.5

78.3

54.6

62.5

61.7

72.2

77.8

80.9

83.9

Virgin West Coast 1

..

79.5

77.0

81.7

62.8

68.7

73.5

74.8

72.1

83.5

86.0

GB long-distance operators 1

..

81.7

80.6

83.8

69.1

70.2

70.6

73.4

79.1

82.2

84.8

GB regional operators 2

..

90.6

88.6

89.1

81.7

79.1

80.5

82.8

82.6

85.0

87.6

1 For long-distance operators, the figures are the percentages of trains which arrive at the final destination within ten minutes of the timetabled time (i.e. are no more than 9 minutes and 59 seconds late)
2 For regional operators, the figures are the percentages of trains which arrive at the final destination within five minutes of the timetabled time (i.e. are no more than 4 minutes and 59 seconds late)

« Previous | Contents | Next »

Page updated: Friday, December 14, 2007