On this page:

Scotland Rural Development Programme 2007-2013: Aid for Agri-Environmental Commitments (Point IV.C.2 of the Guidelines)

« Previous | Contents |

Listen

Annex D

Rural Development Contract Rural Priorities under new SRDP: Agri-Environment Measures

Item

Payment Rate

Management of Cropped Machair (harvested by binder & stooks gathered into stacks)
Without farmyard manure/seaweed
With farmyard manure/seaweed

£222.00/ha
£233.00/ha
£279.00/ha

Mammal and bird control (Restricted)*
Predator Control
Crow Control
Predator control for black grouse and capercaillie

£2.00/ha
£270 per trap
actual costs up to £7.50/ha

Management of Moorland Grazing

£1.30/ha

Management of Grass Margins and Beetlebanks in Arable Fields

£476.00/ha

Biodiversity cropping on In-Bye

£71.00/ha

Supplement where cereal crop harvested by binder and stooks gathered into stacks

£400.00/ha

Wild bird seed/ Unharvested crop

£396.00/ha

Management of Hedgerows (landscape or biodiversity)

£0.93/metre

Management of Extended hedgerows (landscape or biodiversity)

£0.54/metre

Management of species rich grassland

£111.00/ha

Bracken management programme for habitat enhancement

£28.00/ha

Creation and management of species rich grassland

£227.00/ha

Management of coastal or serpentine heath

£77.00/ha up to 30has
£44.00/ha next 40has
£1.30/ha thereafter

Management of lowland heath

£123.00/ha

Management of habitat mosaics

£104.00/ha

Wildlife management on upland and peatland sites (restricted)*

£0.70/ha

Arable reversion to grassland/unfertilised grassland includes nutrient reduction

£250.00/ha

Management of mown grassland for wildlife

£175.00/ha

Management of mown grassland for corn buntings

£225.00/ha

Management of mown grassland for corncrakes

£271.00/ha
£381.00/ha
£691.00/ha

Management of grazed grassland for corncrakes

£313.00/ha

Creation and management of early and late cover for corncrakes

£800.00/ha

Management of early and late cover for corncrakes

£162.00/ha

Management of open grazed or wet grassland for wildlife

£111.00/ha

Management of Wetland

£90.00/ha

Creation, restoration and management of wetland

£227.00/ha

Management/restoration of lowland raised bogs

General Mgt. £40.00/ha
Grazing Mgt. £83.00/ha

Creation and management of water margins and enhanced riparian buffer areas)

£294.00/ha

Management of flood plain

£39.00/ha

Management of buffer areas for fens and lowland raised bogs

£269.00/ha

Management of ancient wood pasture (i. on in-bye land; ii. on rough grazings)

i. £105.00/ha
ii. £50.00/ha

Conservation Management Plan with Special Measures for small units
Conservation Management Plan with Special Measures for small units (With Premium)

£25.00/ha plus fixed sum of £180.00
£25.00/ha plus fixed
sum of £275.00/ha

Retention or introduction of cattle of native or traditional breeds for small units

Introduction:£273.00/ha
Retention:£185.00/ha

Management of moorland grazings on sites designated for Uplands and Peatlands*

£2.00/ha

Moorland - Stock disposal

£19.00/ha

Moorland management - away wintering of sheep

£21.00/ha

Moorland management - off wintering of sheep

£9.00/ha

Muirburn and heather swiping

£67.00/ha

Supplementary food provision for raptors: Hen harriers (restricted)*

£1076.00 per nest

Supplementary food provision for raptors: Golden eagles (restricted)*

£32.00 per carcass

Wardening for Golden Eagles (restricted)*

£55.00 per farm unit
£82 per common grazings committee

Management of Scrub and tall herb communities

£94.00/ha

Control of Invasive Non-Native Species
Japanese knotweed, giant hogweed and Himalayan balsam
Red squirrel
Grey squirrel

£160.00/ha
£185.00 per trap site per annum
£111.00 per trap per annum

Soil and Water Management Programme

Option 1. Audit prepared by adviser - 50% of cost up to max £300, otherwise £150.
Option 2. Proportion of costs up to max £30/ha

Organic Farming Conversion and Organic Farming Maintenance

Please see table below

*restricted to SSSIs & Natura 2000 sites

Organic Farming Conversion and Organic Farming Maintenance

Conversion

Maintenance

Land type

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

Year 9

Year 10

Arable

£220

£220

£60

£60

£60

£60

£60

£60

£60

£60

Improved grassland

£120

£120

£60

£60

£60

£60

£60

£60

£60

£60

Fruit & vegetable

£300

£300

£60

£60

£60

£60

£60

£60

£60

£60

Unimproved grassland/ rough grazing

£5

£5

£5

£5

£5

£5

£5

£5

£5

£5

A minimum of £400 per IACS business per management option (conversion or maintenance) applies.

Rural Development Contract Rural Priorities : Capital Items

Item

Rate

Livestock tracks, gates and river crossing - impacts on diffuse pollution

50% of actual cost except for gates which are standard cost item

Sheep management - additional sheep movement to achieve habitat outcomes

£7.82/hr

Primary treatment of bracken

£200/ hectare of infested land

Manual eradication of rhododendron

£3500/ hectare of infested land

Mechanised (and/or chemical) eradication of rhododendron

£850/ hectare of infested land

Eradication of scrub/woody vegetation: Light vegetation category

£600/ hectare

Eradication of scrub/woody vegetation: Intermediate vegetation category

£850/ hectare

Eradication of scrub/woody vegetation: Heavy vegetation category

£1250/ hectare

Removal from site of the cut scrub/woody vegetation: Light vegetation cover

£500/ hectare

Removal from site of the cut scrub/woody vegetation: Intermediate vegetation cover

£1,050/ hectare

Removal from site of the cut scrub/woody vegetation: Heavy vegetation cover

£1,450/ hectare

Dead wood management

£40/ hectare

Stock fence

£4.00/ metre

Enhancing/ modifying a stock fence (in black grouse and capercaillie core areas)

£2/ metre

Upgrading stock to deer fence

£2.75/ metre

Scare or temporary fencing

£1.50/ metre

Rabbit proofing - existing or new stock/ deer fence

£1.90/ metre

Deer fence

£6.90/ metre

Enhancing/ modifying a deer fence (in black grouse and capercaillie core areas)

£5/ metre

Conversion of deer fence to stock fence (in black grouse and capercaillie core areas)

£2/ metre

Fence removal

£2/ metre

Gate

i. Gate for stock fence: £100 each
ii. Gate for deer fence: £170 each

Kissing gate/self-closing gate for non-vehicular access

£350 each

Stile

£55 each

Stock bridge for bog management

Small bridge : £170 per bridge
Large bridge for ditch wider than 1.5m : £620 per bridge

Small-scale tree and shrub planting (on a site not exceeding 0.25 hectares)

£2/tree or shrub

Replacement or new single trees within a Designed Landscape or to enhance the rural landscape

£100/ tree

Post & rail fence

£10/ metre

Building/restoring drystone or flagstone dykes

£17.50 per square metre

Sand blow fencing

£10.00/ metre

Planting of marram grass into areas threatened with erosion

£8 per square metre

Provision of water trough to replace traditional watering points.

£195 each

Installation of water supply pipe to water trough or pasture pump

£3 per metre of pipe laid

Water trough pump: cattle-operated pasture or nose pump

£180 per installed pump

Soil analysis (including sampling)

£24.90 per sample

Planting or re-planting of hedge

£4.30/ metre

Coppicing of hedge

£4.00/ metre

Laying of hedge

£8.00/ metre

Creation or restoration of a pond

£3.00 per square metre

Laying down species-rich grassland

£680 per hectare

Heather restoration (in black grouse core areas)

£250/ hectare

Heather track creation for bog management

£1.50/ metre

Peat dam

£0.26 per metre of moor grip to be blocked with peat dams. Minimum payment £300.

Ditch blocking with plastic piling dams

(a) For small ditches up to 0.5m wide and deep: £60/dam.
(b) For medium ditches up to 1m wide and deep: £120 per dam.
(c) For large ditches of depth up to 1m and 2m wide: £280 per dam

Underdrain (or culvert) breaking

£20 per drain (or culvert) broken

Watercourse Channel Enhancement

£4.00/ linear metre of watercourse

Provision of bat or bird box

£15.00 per box

Open range deer management to enhance the natural heritage

£3/ha of eligible deer range

« Previous | Contents |

Page updated: Tuesday, July 24, 2007