On this page:

Consultation on the Rural Development Programme for Scotland 2007 - 2013

« Previous | Contents | Next »

Listen

ANNEX G

STANDARD CAPITAL ITEMS
NON-PRODUCTIVE (CAPITAL) INVESTMENTS TO WHICH STANDARD RATES OF PAYMENT APPLY - Provisional List

Capital investments will be funded under the Rural Development Measures. Where possible and appropriate to do so, payment for capital investments will be claimed using a national set of standard rates of payment; this will apply, in the main, to non-productive investments linked to the achievement of agri-environment and afforestation commitments. These payment rates will be set using information obtained from relevant practitioners and will reflect the cost of doing the work to a certain specification, in terms of labour, materials and plant. Payment for investments associated with building or engineering projects, for the provision of fixed equipment and, for other works where the application of a standard specification and standard rate of payment would not be appropriate, will be claimed on an actual cost basis, requiring presentation of receipted invoices and other relevant supporting documentation.

NON-PRODUCTIVE (CAPITAL) INVESTMENTS TO WHICH STANDARD RATES OF PAYMENT APPLY - Provisional List

CAPITAL ITEM

1

Bracken eradication - Primary treatment in Yr 1 of 5-year programme
… by mechanical method (3 cuts/yr)
… by chemical method

2

Bracken whipping as part of woodland management

3

Rhododendron Control:
… using flail
… cut, rake & burn using excavator
… uproot & burn using excavator

4

Rhododendron Control:
… manually cut & burn

5

Woody vegetation control (not Bracken or Rhododendron)
… by mechanical means only

6

Woody vegetation control (not Bracken or Rhododendron)
… involving mechanical cutting and chemical stump treatment

7

Control of invasive non-native plants (e.g. Giant hogweed, Japanese knotweed & Himalayan Balsam) by hand

8

Soft rush management

9

Dead wood management

10

Stock fence

11

Stock fence marked to reduce bird collision

12

Upgrading stock to deer fence

13

Scare or temporary fence

14

Rabbit proofing fence

15

Deer fence

16

Deer fence marked to reduce bird collision
… orange barrier netting

17

Deer fence marked to reduce bird collision
… wooden droppers

18

Deer fence marked to reduce bird collision
… chestnut paling

19

Marking of deer fences to reduce bird collision
… orange barrier netting

20

Marking of deer fences to reduce bird collision
… wooden droppers

21

Conversion of deer fence to stock fence

22

Dismantling deer fences

23

Dismantling stock fences

24

Gate and posts

25

Post & rail fence for protecting trees

26

Watergate

27

One-step stile

28

Two-step stile

29

Ladder stile suitable for deer fence

30

Stock bridges for bog management

31

Building/restoring drystone dykes or walls (incl. mortared walls)

32

Screening access paths from public highways as a noise reduction measure:
… planting hedge (see item 44)
… planting native-species/exotic trees (see item 33)
creating earth banks

33

Native-species tree planting on a site not exceeding 0.25 ha

34

Non-native/exotic species tree planting on a site not exceeding 0.25 ha

35

1.2 m tree shelter and stake

36

0.6 m tree shelter and stake

37

Vole guard, quill or 0.6 m spiral guard & cane for hedge plants

38

Planting of marram grass

39

Provision of water trough

40

Water pipe & trench

41

Water trough pump
… stock-operated pasture pump

42

Water trough pump
… powered pump (solar, wind or water)

43

Soil analysis

44

Planting, replanting, coppicing or laying of hedge (6 plants/metre)

45

Creation or restoration of a pond (max area 2,000 sq metres)

46

Sowing of species-rich grassland (seed mix and preparation of seedbed)

47

Heather restoration

48

Heather track creation for bog management

49

Sand blow fencing

50

Restoration of parkland gate piers and ha has within Designed Landscape

51

Amenity tree planting (exotic trees - standard) for Designed Landscape

52

Blocking ditches (on lowland raised bogs, to create wetland & moorland flushes)

53

Provision of bat boxes

54

Provision of bird boxes (small)

55

Provision of bird boxes (large)

56

Provision of hibernation sites for amphibians

57

Footpath construction - standard spec

58

Footpath construction - high spec

59

Upland/mountain footpath construction - stone pitching

60

Grass cutting in recreational areas (Path strimming - 3 m wide)

61

Footpath upgrading (incl. path maintenance as & when required)

62

Piped culvert for footpath

63

Stone-built cross drain or culvert

64

Kissing gate for walkers, disabled & horse

65

Waymarkers

66

Signpost - Threshold

67

Signpost - Primary

68

Signpost - Finger post

69

Signpost - Interpretation Board

70

A3 Leaflets

71

A4 Leaflets

72

Picnic table with benches

73

Picnic bench with back rest

74

Litter removal

75

Fly tipping discouragement

76

Footbridge - low spec crossing

77

Footbridge - high spec crossing

78

Board walk

79

Fell/extract dangerous tree

80

Manual brashing

81

High pruning

82

Car park

« Previous | Contents | Next »

Page updated: Monday, April 3, 2006