Wednesday, November 25, 2009
You are here: Publications > 2006 > March > Audit of the Main Cable Inspection and Assessment: > Contents
Next »
Listen
Flint & Neill Partnership Consulting Engineers ISBN 0 7559 1331 0 (Web only publication)
This document is also available in pdf format (545k)
1 Introduction2 Background3 Audit Methodology4 Project Tasks5 Audit Task 'a'. Load model for main cables
6 Audit Task 'b'. Strength Model of main cable 6.1 The scope of the internal investigation 6.2 The methodology of the site investigations 6.3 The findings and recording of the internal investigation 6.4 The findings and reporting of the associated testing 6.5 The calculation of cable strength from the inspection and testing
7 Audit Task 'c'. Estimation of a deterioration model8 Audit Task 'd'. Establishment of acceptable reliability levels for the structure9 Other aspects considered during the audit period.10 Applicability of NCHRP Guidelines to Forth Bridge11 Summary of Findings12 Recommendations for Further Work13 Conclusion
Appendix A - Audit Trail DocumentAppendix B - Register of Audit DocumentsAppendix C - Commentary on Notional Factors of SafetyAppendix D - Response on Draft Report by Weidlinger/Faber Maunsell
Page updated: Friday, March 3, 2006