On this page:

Specification for the Reinstatement of Openings in Roads - Revised October 2003, Following Consultation

« Previous | Contents | Next »

Listen

SPECIFICATION FOR THE REINSTATEMENT OF OPENINGS IN ROADS

Appendix A11
Bitumen Binder Equivalence

A11.1 Introduction

In some road types, particular binder grades are not permitted or are not permitted for machine-lay. In general, hand laying is not recommended where the material is likely to be difficult to compact adequately, especially in cold conditions.

A11.2 Base (Roadbase) and Binder Course Materials

Binder grades permitted for base (roadbase) and binder course materials are shown in Table A11.1, provided that the layer thickness is amended to that shown in the table.

Material

Bitumen Stiffness

Combined Base (Roadbase)/Binder Course (mm)

Binder Course Only (mm)

Road Type

Road Type

0

1

2

3

4

3

4

20 mm DBC

200 pen

NP

NP

NP

NP

155 H

NP

85 H

100 pen

410 H

260

210

150

110

60

60

70 pen

380

215

180

135

105

60

60

50 pen

360

200

165

120

100

60

60

50/20 HRABC

100 pen

NP

NP

275 H

215 H

155 H

85 H

85 H

70 pen

NP

NP

245

190

135

75

75

50 pen

360

260

210

150

110

60

60

Notes to Table A11.1:
1) NP = Not Permitted
2) H = Hand-lay only - not recommended for hot conditions & not permitted for machine-lay

Table A11.1 - Permitted Base (Roadbase)/Binder Course Binder Grades and Layer Thickness

A11.3 Surface Course Materials

Binder grades permitted for surface course materials are shown in Table A11.2. No alteration in the layer thickness is permitted.

Material

Bitumen Stiffness

Road Type

0

1

2

3

4

10 mm
CGSC

200 pen

NP

NP

NP

tickH

tickH

100 pen

NP

NP

NP

tick

tick

70 pen

NP

NP

NP

tick

tick

50 pen

NP

NP

NP

tick

tick

30/14
HRAWC

100 pen

NP

NP

NP

tickH

tickH

70 pen

NP

NP

tick

tick

tick

50 pen

tick

tick

tick

tick

tick

10 & 14 mm
SMA

100 pen

H

H

H

H

H

70 pen

tick

tick

tick

tick

tick

50 pen

tick

tick

tick

tick

tick

Notes:
1) NP = Not Permitted
2) H = Hand-lay only - not recommended for hot conditions & not permitted for machine-lay

Table A11.2 - Permitted Surface Course Binder Grades

« Previous | Contents | Next »

Page updated: Friday, April 7, 2006