Sunday, March 21, 2010
You are here: Publications > 2003 > March > Scottish Strategic Rail Study - Final Report > Scottish Strategic Rail Study - Final Report
« Previous | Contents | Next »
Listen
Final
December 2002
Prepared for:
Prepared by:
Scottish Strategic Rail Study Project Steering Group
Steer Davies Gleave
1. INTRODUCTION Background Aims of this Paper Working Paper Structure 2. REVIEW OF THE HRS AND CONTENDING SCHEMES FOR THE MRS SESTRAN SPT NESTRANS Tay Area Inter-Regional New Branch Lines and Spurs New Stations 3. OPERATING AND CAPITAL COSTS Operating Costs -Overview Capital Costs - Overview SESTRAN Capital Cost Estimates SESTRAN Additional Annual Operating Costs SPT Capital Cost Estimates SPT Additional Annual Operating Costs NESTRANS Capital Cost Estimates NESTRANS Additional Annual Operating Costs Tay Estuary Capital Cost Estimates Tay Estuary Additional Annual Operating Costs Inter Regional Service Capital Cost Estimates Inter Regional Additional Annual Operating Costs 4. DEMAND Methodology Results Summary 5. OUTLINE COST BENEFIT APPRAISAL Inputs Appraisal 6. DEMAND FORECASTS SENSITIVITY TESTS Results With 'Quality/Comfort' Factors 15% Average Fares Reduction on Long Distance Inter-Regional Movements 5% Average Fares Increase Across the Study Area 15% Reduction in Journey Times on Long distance Inter-Regional Movements 10% reduction in journey times on intra-SESTRAN and intra-SPT and between SESTRAN and SPT A lower journey time elasticity for the core MRS test 7. SCHEME ANALYSIS Introduction Long Distance Inter-Regional, Tay and NESTRANS SPT SESTRAN Inter-Regional TABLESTable 2.1 New Branch Lines and Spurs Table 2.2 New Stations Summary Table 3.1 SESTRAN Medium Resource Scenario Table 3.2 SESTRAN Incremental Operating Costs m pa Table 3.3 SPT Medium Resource Scenario Table 3.4 SPT Incremental Operating Costs m pa Table 3.5 NESTRANS Medium Resource Scenario Table 3.6 NESTRANS Incremental Operating Costs m pa Table 3.7 Tay Area Medium Resource Scenario Table 3.8 Tay Estuary Incremental Operating Costs m pa Table 3.9 Inter Regional Medium Resource Scenario Table 3.10 Inter Regional Incremental Operating Costs m pa Table 3.11 Summary of Capital and Operating Costs m Table 4.1 Overcrowding Impacts Upon Do Minimum Passenger Journeys (000s)Table 4.2 Summary Of Passenger Miles And Journeys Within The Study Area (000s)Table 4.3 volumes and revenues by region for Medium Resource vs Do Minimum 2010 (000s)Table 4.4 Do Minimum Journeys Matrix 2010 Table 4.5 Medium Resource Scenario Journeys Matrix 2010 Table 4.6 Medium resource incremental journeys matrix 2010 Table 4.7 Medium Resource Scenario % Uplift In Journeys 2010Table 4.8 Do Minimum Passenger Miles Matrix 2010 Table 4.9 Medium Resource Passenger Miles Matrix 2010 Table 4.10 Medium Resource Scenario Incremental passenger Miles Matrix 2010Table 4.11 Medium Resource Scenario % Uplift in Journeys 2010Table 4.12 Do Minimum Revenue Matrix 2010Table 4.13 Medium Resource Scenario Revenue Matrix 2010 Table 4.14 Medium Resource Scenario Incremental Revenue Matrix 2010 Table 4.15 Medium Resource Scenario % uplift in Revenue 2010Table 5.1 Present Value of User Benefits (2000 Prices and Values) Table 5.2 Present Value Non User Benefits (2000 Prices and Values)Table 5.3 Medium Resource Scenario Economic Appraisal Table 6.1 Summary Of Passenger Miles And Journeys Within The Study Area With And Without Comfort Factors (000S) Table 6.2 15% Reduction in Average Fares on long distance inter-urban flows - Incremental Journeys over MRS (000s) Table 6.3 15% Reduction in Average Fares on long distance inter-urban flows - Incremental Passenger-Miles over MRS (000s)Table 6.4 15% Reduction in Average Fares on long distance inter-urban flows - Incremental Journeys over MRS (000s)Table 6.5 15% Reduction in Average Fares on long distance inter-urban flows - Incremental Revenue over MRS (000s) Table 6.6 15% Reduction in Average Fares on long distance inter-urban flows - Incremental passenger miles over MRS (000s) Table 6.7 5% Increase in Average Fares - Incremental Journeys over MRS (000s) Table 6.8 5% Increase in Average Fares - Incremental Revenue over MRS (000s) Table 6.9 5% Increase in average fares - Incremental Passenger-Miles over MRS (000s) Table 6.10 15% Reduction in Long Distance Inter - Regional Journey Times - Incremental Journeys over MRS (000s) Table 6.11 15% Reduction in Long Distance Inter-Regional Journey Times - Incremental Revenue over MRS (000s) Table 6.12 15% Reduction in Long Distance Inter-Regional Journey Times - Incremental Passenger-Miles over MRS (000s) Table 6.13 10% Reduction in intra-SESTRAN, intra-SPT and between SESTRAN and SPT Journey Times - Incremental Journeys over MRS (000s) Table 6.14 10% Reduction in intra-SESTRAN, intra-SPT and between SESTRAN and SPT Journey Times - Incremental Revenue over MRS (000s) Table 6.15 10% Reduction in intra-SESTRAN, intra-SPT and between SESTRAN and SPT Journey Times - Incremental Passenger-Miles over MRS (000s) Table 6.16 Lower Journey Time Elasticity - Incremental Journeys over MRS (000s)Table 6.17 Lower Journey Time Elasticity - Incremental Revenue over MRS (000s)Table 6.18 Lower Journey Time Elasticity - Incremental Passenger-Miles over MRS (000s)Table 7.1 SESTRAN to Dundee/Angus/NESTRANS Inter-Regional ServicesTable 7.2 SPT to Stirling/Tay/NESTRANS Inter-Regional ServicesTable 7.3 SESTRAN to Perth/HIghlands Inter-Regional ServicesTable 7.4 Dundee Local ServicesTable 7.5 NESTRANS Local ServicesTable 7.6 Package of NESTRANS and Tay Local Services and Glasgow and Edinburgh Inter Regional services to Aberdeen (Discount Rate 6.0%) Table 7.7 Package of NESTRANS and Tay Local Services and Glasgow and Edinburgh Inter Regional services to Aberdeen (Discount Rate 3.5%) Table 7.8 Services Contending For Use of Glasgow Central HL Table 7.9 Glasgow Central HL Package (Discount rate of 6%) Table 7.10 Glasgow Central HL Package (Discount rate of 3.5%)Table 7.11 SPT Cumbernauld Line Enhancements Plus Allandar Sports Centre and Parkhead Forge StationsTable 7.12 Service Contenders for Use of Edinburgh Waverley (Discount Rate is 6%)Table 7.13 Services Using Western Approach to Edinburgh Waverley By Design Option Table 7.14 Edinburgh Waverley Options (Discount rate 6%)Table 7.15 Edinburgh Waverley Options (Discount rate 3.5%) Table 7.16 Services Using Western Approach to Edinburgh Waverley By Design option (Sub-surface station at Edinburgh Airport)Table 7.17 Edinburgh Waverley Options as an Incremental Addition to a Sub Surface Station and through routeing of services at Edinburgh Airport (Discount rate 6%) Table 7.18 East Stirling Station APPENDICESA Demand Forecasting Service Definitions (Medium Resource Scenario)B Train Paths and Capacity AnalysisC Demand Forecasts - Medium Resource ScenarioD The SSRS and the Rail Links to Glasgow and Edinburgh Airports Study and the Central Scotland Transport Corridor Studies
The views expressed in this report are those of the researcher and do not necessarily represent those of the Department or Scottish Ministers.
Page updated: Friday, April 7, 2006